CONCRETE 1:3:6, Grade 15 N/mm2 (MPa)


CONCRETE 1:3:6, Grade 15 N/mm2 (MPa)
1.COMPOSITION
Ingredient
Specification
Quantity
Cement
Ordinary Portland Cement
1 part in 10 of dry volume
Coarse sand
Coarse sand used for concrete mixing
doesn’t have clay or organic matter. The fine
sand shall not be used in concrete mixing.
3 parts in 10 of dry volume
Aggregate 20x40 mm
Minimum stone size 20 mm, maximum size
40 mm. No dust, clay or organic matter.
6 parts in 10 of dry volume
Water
Clean and free water from any organic or inorganic matter in solution or suspension. It shall not contain any grease or greasy particles, clay or salt ( Drinking water).
105 litres per m3 of mix or
23 litres per 50 kg bag of
cement, but anyway the
minimum amount needed to mix and pour concrete
1.OTHER REQUIREMENTS







The consistency of fresh concrete shall be monitored by slump test:
  • Minimum slump: 80 mm
  • Maximum slump:120mm
  • Concrete compressive strength should be Strength Grade   15 N/mm2
3.CONSTRUCTION TECHNIQUES
Concrete mixing
1:3:6
Mixing by hand for small works or by machine for large works
Compaction
Compact by hand poker or simple equipment for small works or by mechanical
vibrator for large works
Construction joint
The construction joints shall be made where concrete placing operations end
for the day or where one concrete structural element is cast against a
previously placed concrete structural element. The construction joint shall
extend entirely through the concrete element. In a normal contraction joint
load transfer, additional to that provided by reinforcing steel when present at
the joint, shall by aggregate interlock. This requires the first placed concrete to
have a rough and irregular surface at the join. If the roughened surface is
prepared by scab bling then the joint must be thoroughly cleaned with
compressed air or other effective means before placing fresh concrete. Keyed
joints shall not be used because this method has poor load transfer, especially for unreinforced concrete. If the construction joint is made smooth in
unreinforced concrete then dowel bars shall be used to achieve load transfer across the joint.





Finishes
Smooth surface finishes are not required for the ue permitted in 4 below.
Curing
  • Newly placed concreteafter 6 hours shall be protected from drying wind,
             rain and sun by completely covering it with plastic (or other)   
             sheeting.
  • The concrete, including exposed faces, shall be frequently wetted by
             approved means for at least 7 days after placing.
  • During the curing period, the concrete shall be left undisturbed other than
             works to be covered.
4.USES
Concrete 1:3:6 used for
  • Mass concrete foundations.
  • Blinding concrete.
  • Pre-foundation of culvert.
5.CALCULATION OF MATERAIL QUANTITIES PER 1m3 OF CONCRETE
Concrete 1:3:6
Material
Amount
Unit
Cement
230
kg
Coarse Sand
0.45
m3
Aggregate 20x40mm
0.90
m3