CONCRETE
1:2:4, Grade 25 N/mm2 (MPa)
|
|||||||||
|
1.COMPOSITION
|
|||||||||
|
Ingredient
|
Specification
|
Quantity
|
|||||||
|
Cement
|
Ordinary Portland Cement
|
1 part in 7 of dry volume
|
|||||||
|
Coarse sand
|
Coarse sand used
for concrete mixing
doesn’t have clay
or organic matter. The fine
sand shall not be used in concrete mixing.
|
2 parts in 7 of dry volume
|
|||||||
|
Aggregate 10x20 mm
|
Minimum stone size 10
mm, maximum size
20 mm. No dust, clay or organic matter.
|
4 parts in 7 of dry volume
|
|||||||
|
Water
|
Clean and free water from any organic or inorganic
matter in solution or suspension. It shall not contain any grease or greasy
particles, clay or salt ( Drinking water).
|
149 litres per m3
of mix or
23 litres per 50 kg
bag of
cement, but anyway
the
minimum amount needed to mix and pour concrete
|
|||||||
|
1.OTHER REQUIREMENTS
|
|
|
|||||||
|
Cone
size: 10x20x30 cm
|
The consistency of
fresh concrete shall be monitored by slump test:
|
||||||||
|
3.CONSTRUCTION TECHNIQUES
|
|||||||||
|
Concrete mixing
1:2:4
|
The type of this concrete should be mix by machine.
|
||||||||
|
Compaction
|
This type of concrete should be compact by mechanical
vibrator.
|
||||||||
|
Construction joint
|
The construction
joints shall be made where concrete placing operation send for the day or
where one concrete structural element is cast against a previously placed
concrete structural element. The construction joint shall extend entirely
through the concrete element. In a normal contraction joint load transfer,
additional to that provided by reinforcing steel when present at the joint,
shall by aggregate interlock. This requires the first placed concrete to have
a rough and irregular surface at the join. If the roughened surface is
prepared by scab bling then the joint must be thoroughly cleaned with
compressed air or other effective means before placing fresh concrete. Keyed
joints shall not be used because this method has poor load transfer, especially
for unreinforced concrete. If the construction joint is made smooth in unreinforced
concrete then dowel bars shall be used to achieve load transfer across the
joint.
|
||||||||
Finishes
|
|
||||||||
|
Curing
|
|
||||||||
|
Plastering
|
Structural concrete shall not be plastered unless
required by the drawings.
|
||||||||
|
4.USES
|
|||||||||
|
Concrete 1:2:4 used for
|
|
||||||||
|
5.CALCULATION OF MATERAIL QUANTITIES PER 1m3
OF CONCRETE
|
Concrete
1:2:4
|
||||||||
|
Material
|
Amount
|
Unit
|
|
||||||
|
Cement
|
325
|
kg
|
|||||||
|
Coarse Sand
|
0.43
|
m3
|
|||||||
|
Aggregate 10x20mm
|
0.86
|
m3
|
|||||||